Raw Material Purchase Order Format

A PO for raw materials and components where the specification matters as much as the price: grade, tolerances, inspection and staggered deliveries.

  • Specification columns
  • Delivery schedule
  • Inspection terms
  • Editable fields
  • Live totals
  • Your logo
  • Currency choice
  • PDF download
  • Share on WhatsApp
  • Print
  • A4 · A5 · Letter · Legal

Everything stays in your browser; nothing is uploaded. Drafts, your logo, item list and number series are saved only in this browser's storage.

Your business (buyer)

Logo (optional, PNG/JPG/SVG/WebP, max 1 MB)

Read on your device and kept in this browser only.

Supplier / vendor

Leave empty if unregistered.

Deliver to

Document details

Includes the financial year, e.g. INV/26-27/

Leave empty to use “PURCHASE ORDER”.

Line items

1 line

Line 1

Delivery schedule

Charges & tax

Usually the state where goods are delivered to you. Compared with the supplier / vendor state.

Select both states to see CGST + SGST or IGST

Leave empty if charges are not taxed.

Check each item's GST rate and HSN/SAC yourself; rates change by notification.

Notes, terms & signature

Design

Layout
Accent colour
Font
Sections on the document

Paper

Orientation
Margins

What this template includes

Buyer and supplier
Names, addresses, GSTINs and contact persons on both sides. Add your quality contact, so inspection queries reach the right person.
PO details
PO number, date, revision number and quotation or rate-contract reference. The revision number tells everyone which version is live.
Material lines
Item code, description, grade or standard, size and tolerance, drawing number and revision, HSN, quantity, unit and rate. Quote the drawing revision every time; an old drawing is the fastest route to a rejected lot.
Delivery schedule
Quantities due by date, for orders delivered in lots. Ask for each lot to come with its own invoice quoting the PO and lot number.
Quality terms
Inspection point, test certificate requirement, rejection and replacement terms. Name the standard or sampling plan you inspect to, if you use one.
Commercial terms
Freight, packing, payment terms, price basis and GST. For metals and other commodities, say whether the price is fixed or linked to a published index, and how often it is reset.
Approval
Prepared, checked and approved signatures, and supplier acceptance.

Example use case (illustrative)

A Ludhiana auto-parts maker (sample GSTIN 03ABCDE1234F1Z5) orders 12 tonnes of bright steel bars from a Mandi Gobindgarh mill (sample GSTIN 03VWXYZ6789L1Z2). The PO specifies the steel grade, diameter with tolerance and length, asks for a mill test certificate with every lot, and schedules 4 tonnes in each of the next three months.

It states that material failing incoming inspection will be returned at the supplier’s cost, and that each lot’s invoice must quote the PO number and lot number.

Steel is sold by weight, so the PO allows an agreed plus-or-minus quantity tolerance per lot and says the buyer’s weighbridge reading settles any billing dispute. Both parties are in Punjab, so the expected tax is CGST + SGST.

Before the second lot the mill raises its price. The buyer issues PO revision 1, valid for lots dispatched from the agreed date, and the mill signs it. Lot 1 stays at the old rate, so nobody argues later about which invoice carries which price.

How to fill in the Manufacturing purchase order

  1. Reference the agreed rate. Enter the PO number and the quotation or rate contract the prices come from.
  2. Specify each material precisely. Give the grade or standard, dimensions, tolerances and drawing number with revision.
  3. Set the delivery schedule. Break the total quantity into lots with dates if you do not want everything at once.
  4. Write the quality terms. State where inspection happens, which certificates you need and what happens to rejected material.
  5. Approve and issue. Get the PO checked and approved, then send the PDF and ask the supplier to confirm acceptance.

Who the manufacturing purchase order is for

A manufacturing purchase order is a PO for raw materials, castings, components and consumables where the specification matters as much as the price. Use it if you buy to a grade, standard or drawing, need test certificates, inspect material on arrival, or want the quantity delivered in dated lots.

If you buy finished items off the shelf, such as stationery or spares with a catalogue number, the GST purchase order is simpler. If the material comes from a supplier abroad, use the international purchase order and copy your specification lines into it.

Specifications that prevent rejections

Rejections usually start with a vague description. “MS plate 10 mm” leaves room for argument; a grade or standard, a thickness tolerance, a size and a finish do not. If a drawing governs the part, quote the drawing number and revision so the supplier cannot work from an old copy.

Use your own item code as well as the supplier’s. When a part has two names, the item code is what stores, quality and accounts all search for.

Field by field: what stores and quality check on arrival

When a lot arrives, stores checks quantity and lot number against the PO schedule, and quality checks the material against the specification and the test certificate. Each of those checks needs a field on the PO to compare against. If the PO is silent, nobody can reject the lot with confidence.

  • Item code and description: matched to the supplier’s invoice and the material tag.
  • Grade, size and tolerance: checked by quality against the drawing and the test certificate.
  • Drawing number and revision: the revision on the PO must match the one quality has on file.
  • Lot quantity and due date: stores records early, late and short lots against the schedule.
  • Test certificate: the heat or batch number on it should match the material supplied.
  • Price basis: fixed, or linked to an index, with the date of the price used for each lot.

Inspection and test certificates

Say on the PO where inspection will happen: at the supplier’s works before dispatch, or at your factory on receipt. If you need a mill test certificate or another test report with each lot, write it on the PO. Asking for certificates after the material lands rarely works.

Also state the rejection terms: whether rejected material is returned or replaced, who pays freight both ways, and how quickly replacements must arrive.

Schedules, tolerances and revisions

Large raw material orders rarely arrive in one load, so the PO should say what arrives when. Split the total into dated lots, allow a stated quantity tolerance where material is sold by weight or length, and issue a numbered revision whenever price, quantity or dates change.

  • Write the tolerance as a figure you have agreed with the supplier, per lot.
  • Say whose weighbridge or count decides the billed quantity.
  • Keep the PO number on revisions and add “Rev 1”, “Rev 2”.
  • Close the PO when the last lot is received and billed, so stray invoices are caught.

Common mistakes on raw material POs

The costly mistakes on raw material POs are rarely about price. They come from missing specifications, an old drawing revision, no test-certificate clause or a schedule agreed only by phone. Each one turns into a rejected lot, an idle machine or a dispute over who pays the return freight.

  • Copying last year’s PO without updating the drawing revision.
  • Writing “as per sample” with no sample reference or approval date.
  • Accepting a lot without the test certificate the PO asked for, then rejecting it later.
  • Agreeing a rate change by phone and leaving the PO at the old price.
  • Raising a material PO when the material is actually your own, sent out for processing.

Job work and material sent out

If you send your own material to a job worker for processing, that movement is not a purchase. It goes out on a delivery challan and follows separate GST and e-way bill rules for job work. Inter-state movement of goods to a job worker needs an e-way bill whatever the value.

A separate PO for the job work charges can still sit alongside the challan.

Read more: E-way bill rules for job work

Frequently asked questions

What should a purchase order for raw material include?

At minimum: a precise specification (grade, size, tolerance), quantity and unit, agreed rate, delivery schedule, inspection and certificate requirements, rejection terms, freight and payment terms.

Can one PO cover deliveries over several months?

Yes. Use the delivery schedule to split the total quantity into dated lots. Ask the supplier to quote the PO number and lot on each invoice.

How do I handle a rate change mid-order?

Issue a revised PO with a revision number and the date the new rate applies from, and get the supplier’s acceptance. Avoid agreeing changes only by phone.

Does the supplier need an e-way bill for my raw material?

The e-way bill depends on the movement of goods and the consignment value, not on the PO. Where it is required, the supplier or transporter usually generates it using the supplier’s invoice details.

Can I use one PO for a year of supplies at a fixed rate?

Yes. Many manufacturers issue an open or annual PO against a rate contract and call off quantities with dated schedules. Put a validity date on it, and a review clause if the rate is linked to market prices.

What should happen to rejected raw material?

Whatever your PO says. State whether rejected lots are returned or replaced, who pays freight both ways and how fast a replacement must arrive. Without those terms, every rejection becomes a negotiation.

Should the PO name the test standard or just ask for a certificate?

Name both. A certificate only helps if it reports results against the grade or standard you specified, with a heat or batch number that matches the material supplied.

More business document templates

Android app

Selling goods within India too?

E-Way Easy helps you create the sales invoice, review the e-way bill details and generate it, all from your phone.